To do list for new CMS_VICE boards
- Update firmware: 4 bit serial no, 1 bit GPIO switch to 10.x.x.x address
- Write VFE simulator and FE simulator firmwares for testing VFE-FE passthrough.
- Make power cable 15 ft long 2x AWG 10 (fan out to 5 power connectors)
- Order SFPs, short fibers
- (IPBus firmware programming)
Done?
- Flash chips replaced
- Order switch (done, due Monday)
- Move power connector to the other side. (done)
- Check I2C jumpers (jumpered directly from FE to VFE)