Historical notes for blades
ID | Location | Remote Access? | ---------- | CM? | Cirex | Notes | ECOs |
001 | BU (assembly room) | no | K | 98716 | Hard-wired 12V on, misc on, zynq bank IO on. Pulldown on zynq_en. 1k pulldown on U15 pin 1. Jumper on switch en to 3.3V. Removed R35 and R40. Test paused after zynq booted successfully. | 1, 2 | |
002 | BU (in Shelf for now) | no | - | 98724 | for show. Test paused after zynq booted successfully. Test completed. | 1, 2 | |
003 | BU (assembly room) | no | - | 1k pulldown on U15. switch fix. J28 has a connector, should be removed. LEDs lit up incorrectly, same as SM004. Stopped testing. | 1, 2 | ||
004 | BU (table) | no | - | 98719 | Resistor between R95 and R92 came off before step "put in zynq." LEDs lit up incorrectly. Stopped testing. Trial 2: Numerous LEDs lit up incorrectly at the same step (6: put in zynq). Stopped again. | 1, 2 | |
005 | Cornell | no | - | 98720 | LEDs hot-wired permanently on. Test completed. | 1, 2 | |
006 | BU | yes | K+V | 98721 | Test paused after zynq booted successfully. Test completed. | 1, 2 | |
007 | Amherst | - | - | 98723 | Missing LED after all ECOs completed. Resoldered new LED. Test completed. | 1, 2 | |
008 | CERN TIF | no | - | 98717 | Missing LED after all ECOs completed. Resoldered new LED. Test paused after zynq booted successfully. Test completed. | 1, 2 | |
009 | Cornell | - | - | 98725 | Test paused after zynq booted successfully. Test completed. | 1, 2 | |
010 | CERN TIF | - | ? | 98718 | Test paused after zynq booted successfully. Test completed. | 1, 2 |