This page documents a test fixture for the new ASDQ boards.
PCB Layout
- SVN Link
- Schematic: SCH / PDF
- PCB Layout: PCB / PDF / Power (png) / Ground (png)
- Parts List: XLS
Suggestions for initial assembly / test:
- Install J1 and J2 and carefully check for opens and shorts.
- Install all parts on page 2 of the schematic (Power connectors, voltage regulators, etc)
- Apply +4V with current limit, and check that +3V, +1.6V, +1.4V are all present
- Apply -4V with current limit, and check that -1.6V and -3V are present
- Install all parts on page 3
- Power up and check that voltages on both ends of R11 and R16 are about -0.4V +/- 0.2V.
ECO list 12-8-14:
- -1.6V Reg was outputting -2.9V, wrong feedback network
- R19 to 68K
- R20 to 24K
Last modified 8 years ago